The Maya Bath Superior Steam Shower Tub Combo is a fully integrated home spa system that combines a steam room, whirlpool bathtub, rainfall shower, and smart entertainment features into one enclosed unit. Designed for two people and powered by a 5kW steam generator, it delivers a complete hydrotherapy and heat therapy experience in a single footprint.
This is not just a shower. It is a self-contained recovery and relaxation system.
What Makes This Steam Shower Different
Most steam showers offer one or two features. This unit combines everything into one system:
Steam therapy
Whirlpool hydrotherapy
Full shower system
Smart entertainment controls
The result is a true multi-modality wellness setup at home.
Full Home Spa Experience in One Unit
4
This unit integrates multiple therapies that are typically separate:
Steam Therapy
5kW steam generator
Rapid steam production
Promotes circulation and relaxation
Whirlpool Hydrotherapy
16 whirlpool jets in the tub
10 acupuncture style body jets
Targeted muscle recovery and tension relief
Rainfall and Handheld Shower
Overhead rainfall system
Dual handheld shower heads
Full shower functionality built in
This combination creates a layered recovery experience, heat, water, and pressure working together.
Built In Smart Features and Entertainment
This system is designed for long sessions, not quick showers.
It includes:
12 inch smart TV
Bluetooth connectivity and speakers
Touchscreen control panel
FM radio and audio input
You can:
Stream content
Listen to music
Control lighting, steam, and jets
All from inside the unit.
Advanced Relaxation Features
4
This is where the unit moves into true spa territory:
Aromatherapy system for essential oils
Chromotherapy lighting and underwater LEDs
Ozone sterilization for hygiene
Foot massager and body jets
These features turn a basic shower into a sensory recovery environment.
Key Specifications
Feature
Specification
Dimensions
64 x 64 x 88 inches
Capacity
2 person
Steam Generator
5 kW
Total Jets
26
Tub Capacity
55 to 95 gallons
Material
Acrylic, fiberglass, tempered glass
Installation
Freestanding corner unit
Who This Is For
This system is ideal for:
Homeowners building a luxury bathroom
Biohackers creating a recovery space
Athletes combining heat and hydrotherapy
Couples wanting a shared spa experience
Anyone replacing multiple devices with one system
What You Are Replacing with One Purchase
Instead of buying separately:
Steam generator
Bathtub
Massage system
Shower system
Audio system
This combines everything into one unit.
That is where the real value comes from.
Installation and Space Considerations
Before purchasing, consider:
Requires dedicated plumbing and electrical setup
Corner installation design
Adequate ventilation required
Weight and delivery logistics
Installation is straightforward for contractors, often described as easier than full bathroom remodel replacements
Why Buy From Biohacker Direct
We do not carry low-quality, underpowered systems.
Every product is selected for:
Real functionality
Long term durability
Proven performance
Free shipping included. Need help planning your setup? Call (855) 950-1940.
FAQs, Maya Bath Superior Steam Shower
Is this a full steam room or just a shower It is a fully enclosed steam system with a dedicated generator.
How many people can use it Designed for two people comfortably.
Does it replace a bathtub and shower Yes, it replaces both while adding steam and hydrotherapy.
Is the steam powerful enough Yes, the 5kW generator produces consistent steam for full enclosure use.
Is installation complicated No, for professionals it is typically simpler than building a custom steam shower.
You have now purchased your new Maya Bath steam shower and want to test it out! The following guide is written to outline the key steps that will be involved during a steam shower installation and highlight some common easy-to-avoid installation problems. Biohacker Direct & Maya Bath cannot accept any liability regarding any costs incurred by preparatory or installation work. All steam shower installation instructions provided with the steam shower or by the original manufacturer should take precedence over this guide.
1. Finding a Qualified Installer
Water is an efficient conductor of electricity and the installation of electrical wiring in a bathroom can be a hazardous job. Maya Bath strongly advises that all electrical work is carried out by a qualified professional. It is advisable to choose a plumber for the installation of the steam shower as well.
2. Preparatory Work
Prior to purchasing you should have confirmed the steam shower dimensions and know where in the bathroom you are placing the steam shower. The steam shower installation will require both a hot and cold water supply along with an electrical feed.
Water Supply: The manufacturer’s steam shower installation booklet will provide measurements to where the hot and cold feeds should be piped. The steam shower will arrive with hot and cold braided hoses on the rear of the unit allowing the unit to be connected and pushed back into position. The water supply pipes should be recessed and not protrude more than ½ inch from the wall. Ball lever valves can be installed to allow quick shut-off of the water to the shower.
Electrical Supply: The 5.0KW steam generators require a 30Amp dedicated power supply to the steam shower. Typically, this will be wired back to the consumer box and can be located on a separate breaker switch. The rated working voltage of a majority of the Maya Bath steam showers is 220V at 60Hz.
Drainage: The manufacturer’s installation booklet will give measurements for positioning the shower’s drainage point. Typically, the shower will come with a flexible drain hose that will be connected to your drainage point.
At this stage you should carry out preparatory decoration as necessary. This may involve plastering, painting or tiling. CAUTION: Never knock nails or drill holes into walls without knowing what is hidden behind them!
3. Tray/Tub
Place the shower tray in its final standing position. Adjust the screw legs that are positioned across the bottom of the tray until the tray is level. This should be checked using a spirit level. Once the tray is level tighten the locking nuts to secure the height of each leg.
4. Top & Side Panels
Move the tray out from the wall about 15-20 inches to allow access to all sides of the cabin during installation. The order of panel placement should follow the specific shower installation instructions. Place sealant between each adjoining panel and also between each panel and the tray. Use the bolts supplied to firmly affix each panel together. Once all acrylic and glass panels have been secured the top piece can be placed onto the side panels. Use the bolts/screws supplied to firmly secure the top piece to the side panels.
5. Connect Adjoining Pipes & Wires
The overhead fan, lights and speakers will all be powered from the main control box. Each wire should be labelled and have matching connectors that come from the control box. These 12V DC wires should now be plugged together. The shower will have water pipes that run to the overhead shower and body jets from the 3-way thermostatic valve. These should be plugged into the corresponding connectors and tightened using the metallic pipe clips and a Phillips screwdriver.
6. Connect Water, Electrics & Drainage
Please check that the water supplies are balanced and at an adequate pressure. The steam showers come with stainless steel flexible hose lines in the back of the unit just like a house washing machine and will connect similar to a washing machine at your home.
Connect the dedicated 220V/110V power lines either directly to your breaker box or plug them into an outlet in the room. It is important that the ground wire is connected to a grounding point in the bathroom or the metal framing of the shower. The installer will be able to advise about correct grounding of the steam shower.
Finally, connect the flexible drain hose into your bathroom’s floor waste point and seal as necessary. Keep in mind that the drain is a flexible hose and you do have room to move it around underneath the tub/pan as well.
7. Sealant
Typically, you should now place a bead of white or clear sealant between the adjoining side panels. Sealant should also be placed between the side panels and the tray to stop any water running along any seams and over the edge of the shower tray.
Once sealant has been applied and allowed to dry, the steam shower should be tested for water tightness. Use the handheld shower to spray water against the water jets, all acrylic/glass panel fixing holes and along the join of all adjoining panels. Typically, it is not necessary to seal the top piece but this is left to the discretion of the installer. Check around the rear and sides of the steam shower to see whether any water has escaped and reseal where necessary. Also, the installer should check that all pipes and fittings are fully spanner tightened and not dripping any water.
Once the unit has been fully checked for water leaks and all electrical features such as lights, radio and steam tested then gently push the unit back into position.
Your Steam Shower Installation Check List
Recessed Hot and Cold water supply lines
Dedicated electrical supply lines
Floor drain setup
Sealant between all adjoining panels
Check that all pipes and joints are fully spanner tightened
Use hand shower to check for water leaks between adjoining panels, jets and other fixings
Sealant around mirror
All glass seals have been connected
All new pipework should be flushed to remove debris before connecting pipes to shower
Please note, the electrical installer of the steam shower is responsible for taking all proper precautions before and during installation as well as checking that the actual electrical equipment (wires, etc.) is not damaged prior to installation.
If you have recently purchased a bathroom product from Maya Bath and require an online copy of the installation manual then please send us an email stating your request and model name.
Large items such as our steam showers and bathtubs will arrive on a large wooden pallets unless otherwise stated. The goods will be delivered on your driveway or similar ensuring that the goods are as close as possible to your property. Please ensure that someone is present at the delivery location to sign the delivery receipt.
What should I do when my product arrives?
Every effort is made by our warehouse team to ensure that your item arrives safely without damage. However, the very nature of transit can present unwanted issues that we are here to help you with. When your item arrives please complete the following checks:
Before signing for the items, check for external damage to the packaging
Report any external damage to the driver and give details on the delivery acceptance notes
If you require a replacement part, contact us to arrange a replacement
We will aim to provide replacements within 48 hours
How long will my delivery take?
Biohacker Direct works closely with Maya Bath to ensure that all stock is available to dispatch as quickly as possible and we aim to deliver your product within 7-15 business days.
If an item is out of stock, you will be provided with a lead-time indicating how long it will take for us to acquire your goods. Lead-times can vary from 1-3 weeks depending on our suppliers and current demand. If you require a product by a particular date, please do not hesitate to let us know – We will always do our best to meet your needs.
How to take the unit inside through doorways?
All of our Steam Showers and bath tubs will go through any doorway of 28 inch or wider so that the items can be taken inside the desired room without any complication.
Orders for large or heavy items ship via a trucking carrier. We offer free shipping on all orders. Freight delivery is typically 2 to 6 business days, allow extra time for remote locations. The Freight Carrier or Tucking company will contact you to set up an appointment time before delivering. Once your product leaves our warehouse, we will send you an email with a link to the freight carrier’s website and the tracking number. Tracking numbers take 1 business day to update.
PACKAGE INSPECTION Please inspect your package upon delivery. If there is obvious damage, please note the damages on the delivery receipt. Contact us within 72 hours to report the damage, by either e-mail or phone. Please retain all original boxes and packaging.
CANCELLATION & RETURNS We accept returns that are brand new and uninstalled minus all shipping costs and a restocking fee of 15%. The grace period to return a product is 20 calendar days from when the product is delivered to your location. The product must be in its original condition including packaging materials, crates, boxes and all pamphlets. Customer is responsible for all shipping costs; those charges will be deducted from your refund. The product should be returned in the same condition including shrink wrap and foam. We will provide a refund minus the shipping costs in the same manner the order was placed. It is the customers’ responsibility to confirm the product will comply with their state, county or city codes and is a buyer responsibility to review the spec sheets prior to their purchase. If you purchased with a credit card, you will be refunded on the same card.
All steam showers from Maya Bath carry a (10) ten year structural warranty against manufacturer defects. The structural warranty protects the structure of the steam shower from peeling, fading, delaminating or cracking. Structural components include the acrylic panels, shower pan and ceiling. All steam shower parts carry a (3) three year guarantee against defects. The structural warranty protects the structure of the tub from peeling, fading, delaminating or cracking. Maya Bath carries all steam shower replacement parts in stock at their California based warehouse and will arrange for a spare part to be delivered to you. Warranty does not cover labor or shipping.